Donjek winter trip in 2006. It snowed all day and the temperature was well below freezing. And we still were able to work. |
|
Donjek fall trip in 2006. Getting ready for working through the winter. |

|
Pogo Mine: Mixer trucks are used to feed the pump truck which will extend it’s arm (boom) to the area that needs to be poured. |
|
The pump truck has a boom the extends as far as 33 meters and can pour concrete into some places that are normally unreachable. |